Map Plumbing

New plumbing work must have a plan, well studied and lay down in advance which must then be approved by the municipality or city hall.
And that's not all, we also send with this plan the list of some materials and installation technology to use. All this because it is from the municipal network (public) to do the connection for the water supply in her new home, and for sewage disposal.
Plumbing must begin before pouring footings and basement slab: pipes, retention pit and drain ... because it is through the network in ground water enters most often in home, even for output. The basement must be accessible for any possible cleaning, renovation, repair, extension or others while having remained protected against sewer backups through a valve.
The plan is as follows: from the large pipe under ground (with a main shutoff valve) from the service line that goes to the water heater; the output of the latter 10, there are two tubes: one for cold water and another for hot water. The main cold water pipes and hot water pipes feeding the side going into the bathroom, kitchen, bidet, wc ... as required.
The list of materials because some materials are currently not permitted as galvanized steel which causes the formation of deposits. Similarly, although copper is allowed, lead alloys for fittings are not exceeded certain rate of interest which is cross-linked polyethylene hose whose connecting joints is easy with rings brass compression or simply PVC.
Regarding the sewage, the plan must provide a drain column which is connected to the sewer, the position is somewhat inclined to provide better drainage of waste water, sometimes also water rain and roof from one or more drains to prevent the emanation by septic gases.
Finally, it should be noted that the plan must be clear, legible and easy to interpret as other plans (electricity plan or plan of the house itself) to provide the extension work, troubleshooting or renewal.